APARTMENT
Jaisalmer and Udaipur Green marble used in the typical lift lobbies; claddings entrance halls and living dining area
Mitsubishi make electrical distribution board installed for electrical supply
POP panning done on the walls and roof for better finish
ROCA make plumbing fittings and chinaware used in the apartments
International procedure adopted for fixing of wall tiles with spacers
Bosch makes music system installed in the entrance lift lobby of each tower and in the garden area
Botochino and Light Emprador marble used in lobbies
LIVING/DINING/LOBBY/PASSAGE
Floor: Imported Marble
Walls: Acrylic Emulsion paint on POP punning
Ceiling: Acrylic Emulsion Paint
BEDROOMS
Floor: Laminated Wooden Flooring
Walls: Acrylic Emulsion paint on POP punning
Ceiling: Acrylic Emulsion Paint
KITCHEN
Walls: Tiles upto 2' above counter and Acrylic Emulsion paint in balance area
Floor: Antiskid tiles
Ceiling: Acrylic Emulsion Paint
Counter: Made in Marble/Granite/Synthetic stone
Fittings/Fixtures: CP Fittings, Double bowl single drain board SS Sink, Exhaust fan
BALCONY
Floor: Terrazzo tiles/Terrazzo cast-in-situ/Ceramic tiles
Ceiling: Exterior paint
TOILETS
Walls: Combination of tiles, Acrylic Emulsion Paint and Mirror
Floors: AntiSkid Tiles
Ceiling: Acrylic Emulsion Paint
Counter: Made in Marble/Granite/Synthetic stone
Fixtures/Accessories: Glass Showerpartition in toilets (7'ht.), Exhaust Fan, Towel rail / ring, Toilet paper Holder, Soap dish
Sanitary ware/CP Fittings: Single Lever CP fittings, Wash Basin, Floor mounted/Wallhung WC of Kohler/Roca/Duravit/Parry ware or Equivalent make
PLUMBING
CPVC and UPVC piping for water supply inside the toilet and kitchen and vertical down takes
FIRE FIGHTING SYSTEM
Fire Fighting System with sprinklers, smoke detection system etc. as per NBC norms
DOORS
Internal and Entrance Doors: Painted/Polished/frame with Painted/Polished flush door/Moulded Skin shutters
EXTERNAL GLAZINGS
Windows/External: Glazing single glass unit with tinted/reflective and/or clear glass with powder coated Aluminum/UPVC Frames in habitable rooms and Aluminum/UPVC frames with clear/Frosted Glass in all toilets
POWER BACKUP
100% DG Power backup as mentioned below:
2 BHK-Not exceeding 5 KVA per apartment
3 BHK-Not exceeding 6 KVA per apartment
4 BHK-Not exceeding 7 KVA per apartment
DG Capacity shall be at 70% of load factor and 70% overall diversity for apartments as well as for common areas
LIFT LOBBY
Lift Lobby Floors: Combination of Granite/Marble/Tiles
Lift Lobby Walls: Combination of Granite/Glass/Acrylic Emulsion Paint on POP punning/Textured Paint
STAIRCASES
Floor: Terrazzo/Mosaic Tiles/Marble/Kota Stone
Walls: Flat oil Paint
PROJECT SIZE
9 Buildings - 562 units LAUNCH DATE
Sep, 2012